| 1 |
Western Railway |
Ratlam |
Stabilization |
Completed in 2013 |
| 2 |
South Central Railway |
Manik Garh |
Stabilization 200,000 sqm |
Completed in 2013 |
| 3 |
North East Frontier Railway |
Agartala- Sabroom Project |
Ground Improvement and Blanket Stabilization |
Completed |
| 4 |
Konkan Railway Corporation |
Verna Road |
Pavement Stabilization |
Completed in 2013 |
| 5 |
Konkan Railway Corporation |
Ratnagiri Section |
Railway track Stabilization |
Trial Completed in2013, the Main section Completed |
| 6 |
Rail Vikas Nigam Limited |
Vijaywada |
Ground Improvement of bad soil locations using Geosynthetics between KM 372 to 407 of Nidubrolu and Duggirala section of vijaywada division of SouthCentral Railway. |
|
| 7 |
Airports Authority of India |
Shimla Airport |
RCC Wall, RSSS, RCSS and Hybrid, Design of drains |
Completed in 12.10.2022 |
| 8 |
Border Roads Organization (CE, Shivalik) |
Joshimath |
Landslide treatment works at KM 19.3 & 19.8 on Joshimath- Malari Road in the 21BRTF area under project Shivalik in the state of Uttarakhand on EPC mode. |
Completed in 20.12.2022 |
| 9 |
National Highways Authority of India |
Kiratpur Nerchowk (Bilaspur) |
Balance Work for Four Lanning of Kiratpur to Ner Chowk Section of NH-21 (From KM 12+750 to 26+500, Km 126+500 to Km 158+500 including ACC Link Road from Km 0+00 to Km 2+003) Greenfield Alignment (Package-2) in the State of Himachal Executed on Hybrid Annuity Mode (HAM) |
Completed in 2023 |
| 10 |
NHIDCL |
Andman & Nicobar |
NHIDCL, Andaman and Nicobar Islands. Slope Protection / rebuilding. |
Completed in 31.03.2021 |
| 11 |
Central University of Jammu, SEW INFRA |
CUJ, Samba Campus |
RIVEL and Reinforced Cut Slope Solution: 35,000 sqm Facia |
Completed |
| 12 |
North Eastern Railway, |
Gorakhpur |
Formation treatment at location of bad formation with Biaxial Geogrid & Geotextile between Km. 59/075 to 62/200 in Bansdih Road – Ballia Section in connection with doubling of Chhapra – Ballia section section. |
Completed 2021 |
| 13 |
Ashoka Buildcon |
NH-6 DhankuniKharagpur |
Pavement Stabilization 6Km |
Completed in March 2014 |
| 14 |
Ashoka Buildcon |
PNG Tollway, Nasik |
Erosion Control 40,000sqm |
Completed in June2012 |
| 15 |
C&C Construction Ltd |
Muzaffarpur Sonbarsa |
Erosion Control |
Completed in June 2002 |
| 16 |
ERA Infra Engineering Ltd |
Delhi – Rohtak |
Erosion Control 100,000 sqm |
Completed in July 2013 |
| 17 |
Ashoka Buildcon |
Dhankuni Kharagpur |
RIVEL 20,000sqm facia |
Completed in2015 |
| 18 |
OSE |
Nagpur Saoner- Betul, NH-69 |
RIVEL |
Completed in June,2014 |
| 19 |
Ashoka Buildcon Ltd |
NH-6, NHAI Project, Sambalpur- Baragarh Road |
Erosion control: 200,000 sqm |
Completed in October 2014 |
| 20 |
Ashoka Buildcon Ltd |
NH-6 Bhandara Road, Maharashtra Chhattisgarh Border Road |
Pavement Repair with Paving fabrics 200,000 sqm |
Completed in 2015 |
| 21 |
Ashoka Buildcon Ltd |
NH-6 SambalpurBaragarh Road |
Polymeric Gabions: Work |
Completed in January 2015 |
| 22 |
Larsen and Toubro Ltd |
Air Force Airport Hindon |
Ground Improvement |
Completed |
| 23 |
Larsen and Toubro Ltd |
PNG Tollway Ltd |
Erosion control and Gabions |
Completed |
| 24 |
Ashoka Buildcon Ltd |
Chennai-Outer Ring Road |
Geocomposites Drainage |
Completed in 2016 |
| 25 |
Gammon India Ltd |
Gorakhpur Bypass |
Reinforced Erosion Control 80,000 sqm |
Completed in 2013 |
| 26 |
IL&FS: ITNL |
NH-21 Kiratpur to Ner Chowk |
Tunnel Waterproofing |
Completed 2017 |
| 27 |
IECCL |
NH-21 Kiratpur to Ner Chowk |
RSS: RIVEL 40mHigh RIVEL: 75,000 sqm Facia |
Completed |
| 28 |
Vishal Infra Ltd |
MES Airport Calicut |
Bituminous Reinforcement with Glass grid and Non Woven Geotextile for Drainage |
Completed in 2015 |
| 29 |
Vishal Infra Ltd |
Airport Authority of India, Kolkata Airport |
Bituminous Reinforcement of Runway with Glaspave 25 |
Completed in2016 |
| 30 |
TATA-Aldesa JV |
Eastern DFCC Package 101,102and 103 |
Reinforced Soil T- Block walls and Reinforced Soil Slopes Structures |
Completed in2021 |
| 31 |
ITNL Ltd |
NH-21 Kiratpur to Ner Chowk |
Geocomposites Drainage for Reinforced concrete Structures |
Completed in2018 |
| 32 |
GMR Infrastructure Limited |
Jhansi- Bhimsen |
Pavement Stabilization |
Completed in2019 |
| 33 |
Larsen & Toubro Ltd. |
Mukkola- T Junction to Tamil Nadu Border |
RCSS (Soil Nailing) |
Completed in 31.03.2018 |
| 34 |
Tarmat |
Avantipur Airport |
Bituminous Reinforcement of Runway with Glassgrid |
Completed in 2018 |
| 35 |
M/s Khurana Construction Limited |
Raipur Airport |
Bituminous Reinforcement of Runway with Glassgrid |
Completed in 2018 |
| 36 |
M/s Khurana Construction Limited |
Amritsar Airport |
Bituminous Reinforcement of Runway with Glassgrid |
Completed in 2018 |
| 37 |
Dinesh Chand Aggarwal Ltd. |
Suratgarh Airport |
Bituminous Reinforcement of Runway with Glassgrid |
Completed in 2017 |
| 38 |
Ashoka Buildcon Limited |
Eastern Peripheral Expressway |
Geocomposites Drainage System for RCC Walls |
Completed in 2019 |
| 39 |
Ashoka Buildcon |
Eastern Peripheral Expressway |
Erosion Control using Geomat |
Completed in 2019 |
| 40 |
TATA ALDESA (JV) |
Bahupur to Khurja |
Erosion Control using Coir mat |
Completed in 2018 |
| 41 |
Solitz and L&T Consortium |
WDFCC CTP-01 &02 Rewari to Iqbalgarh |
Reinforced Earth walls |
Completed |
| 42 |
Ashoka Buildcon Limited |
Ankapalli to Annavarm (Andhra Pradesh) |
Design & Drawing of RE Wall |
Completed in 2022 |
| 43 |
Ashoka Buildcon Limited |
Puintola to Icchapuram (Orissa& Andhra Pradesh) |
Design & Drawing of RE Wall |
Completed in 2022 |
| 44 |
OSE |
Biaora-Dewas (MP) |
Oriental Structural Engg. Pvt. Ltd.-4-Laning of Biaora-Dewas Section of NH-3 from KM 426.100 to KM 566.450 in the State of Madhya Pradesh under NHDP Phase-IV on DBFOT basis |
Completed in 26.02.2019 |
| 45 |
Larsen & Toubro Ltd |
Prithala |
Western Dedicated Freight Corridor Corporation Package CTP-14- Rewari to Dadri Section. |
Completed in 2024 |
| 46 |
NHAI |
Pandoh |
Four Lanning of Nerchowk PANDOH Bypass section NH-21, (Package 1 From KM 190.000 To KM 221.305) Under NHDP-IV In the state of Himachal Pradesh on EPC Basis. |
Completed 31.08.2024 |